I moved out of my previous apt just before Halloween last year. While it had ben known that it was going to have to happen by the end of the year, the residents had all thought we had until the end of the year, and then suddenly the new owners jumped up the schedule, as the new construction was going to be "expedited".

It's now a year later, and at the location, they have dug 4 foundation pits, poured three of them, built the framing on those three, and glazed just two of them.

And yet, only a few blocks down the street, a similar condo construction demolished the old building, dug the pit, poured the concrete, did the framing, set the windows, and are already putting in the plumbing and wiring. In only two months. THAT is "expedited".